Shaw Fabrication Facility – Lake Charles, LA

 

Project Highlights

  • 4 modules (1-Dehydration, 2-Amine, 1-Support Frame)
  • Weight 114 tons total
  • Shaw Scope – Material & Equipment management, structural steel detailing, fabrication & assembly, paint, insulation, hydrostatic testing, PWHT, E&I equipment management and installation, heat trace installation, customer furnished material/equipment preservation and installation, dimensional control, nitrogen shipping & storage purge design and installation, and full NDE
  • 12,000 man hour peak 40
  • Method of shipment –  Truck Freight from Lake Charles, LA to Port of Tacoma, WA
  • Schedule Sep 2017 – May 2018
sound-energy-4 copy

Other Facts

  • 114 tons of structural steel CS
  • 1,886 LF of CS pipe
  • 3 Heat exchangers (Hairpin, Plate & Frame, Shell & Plate)
  • 8 Filters & Drums (Carbon,Water & Reflux)
  • 1 Compressor (Regen Gas)
  • 4 Pumps (Recirculation & Reflux)
  • 2 Separators (Treated Gas Coalescar & Scrubber)
  • 110 LF of cable tray
  • 3,000 LF of wiring
  • 44 Hydrostatic-tests (pressures from 75 to 1127 psi)
  • Units installed at PSE LNG without a single misfit
  • Zero Lost Time Incidents