The Shaw Group Successfully Completes Module Fabrication Project for a Major Global Oil & Gas Company
HOUSTON, TEXAS, September 16, 2024 – The Shaw Group, a global leader in pipe and module fabrication, is pleased to announce the recent completion and successful delivery of a Cold Box to China for a major Oil & Gas Company.
Shaw’s scope included the assembly and installation of Brazed Aluminum Heat Exchangers (BAHX), vapor separators, and standpipes, as well as all related piping, valves, and instruments. With a 3-month schedule, the 458-ton Cold Box was successfully completed and shipped to its first destination, China, ensuring the project remained on track. This system is destined for final installation on a 2.4 MTPA floating liquefied natural gas (FLNG) vessel, which will be stationed offshore in the Republic of Congo and will feature hull-based storage for LNG and LPG, along with topside gas treatment, utilities, liquefaction, and power management systems.
About The Shaw Group: The Shaw Group is a leading provider of pipe and module fabrication services to a diverse range of industries. With over 1.6 million square feet of fabrication and manufacturing capacity worldwide, The Shaw Group offers premier pipe fabrication, module fabrication (including engineering, design, and procurement), induction bending services, and project services to industrial clients globally.