Shaw Fabrication Facility – Lake Charles, LA

Project Highlights:

  • 7 Mega Modules (Pretreatment and Liquefaction Process Modules)
  • Weights between 500 & 1,500 tons
  • Shaw Scope – Material management, structural steel assembly, pipe fabrication & assembly, paint, insulation, fireproofing, electrical tray, pressure testing, dimensional control, PWHT and NDE
  • 1.4 MM Mhr. Peak 150 headcount
  • Method of shipment –  Deck Barge from Lake Charles, LA to Freeport, TX
  • Schedule: Jun ’16 – Apr’18

Other Facts :

  • 6,965 tons of structural steel
  • 10 miles of pipe
  • 4 miles of insulation
  • 1 mile of cable tray
  • 330 hydro-tests
  • Three LQF modules installed at without a single misfit
  • Four PTF modules installed at without a single misfit
  • Zero Lost Time Incidents