Project Highlights

  • 15 Pipe Rack Modules
  • Weights between 31 & 88 tons (1,328 tons total)
  • Shaw Scope – Material management, struct steel assembly, pipe fabrication & assembly, dimensional control, and NDE
  • 67,000 Mhr. Peak 65
  • Method of shipment –  Deck Barge from Lake Charles, LA to Plaquemine, LA
  • Schedule: Dec ’19 – Jul ’20.

Other Facts

  • 858 tons of structural steel
  • 5 miles of pipe
  • Material management of an additional 760 tons of fabricated structural steel and 4.7 miles of fabricated spools
  • Zero Loss Time Incidents