Shaw Fabrication Facility – Lake Charles, LA
Project Highlights
- 4 modules (1-Dehydration, 2-Amine, 1-Support Frame)
- Weight 114 tons total
- Shaw Scope – Material & Equipment management, structural steel detailing, fabrication & assembly, paint, insulation, hydrostatic testing, PWHT, E&I equipment management and installation, heat trace installation, customer furnished material/equipment preservation and installation, dimensional control, nitrogen shipping & storage purge design and installation, and full NDE
- 12,000 man hour peak 40
- Method of shipment – Truck Freight from Lake Charles, LA to Port of Tacoma, WA
- Schedule Sep 2017 – May 2018
Other Facts
- 114 tons of structural steel CS
- 1,886 LF of CS pipe
- 3 Heat exchangers (Hairpin, Plate & Frame, Shell & Plate)
- 8 Filters & Drums (Carbon,Water & Reflux)
- 1 Compressor (Regen Gas)
- 4 Pumps (Recirculation & Reflux)
- 2 Separators (Treated Gas Coalescar & Scrubber)
- 110 LF of cable tray
- 3,000 LF of wiring
- 44 Hydrostatic-tests (pressures from 75 to 1127 psi)
- Units installed at PSE LNG without a single misfit
- Zero Lost Time Incidents